Sizing and net-cost calculator

Solar Carport ROI Calculator

Enter your parking bays and electricity use. See an indicative system size, the cost after tax relief, payback and a 25-year cash flow, with every assumption shown and changeable.

Your car park

1.5 is this site's planning figure. Four 580 W modules (2.3 kWp) is the full-coverage ceiling on a 2.4 x 4.8 m bay.
PVGIS v5.3 for the region and layout, losses included. Overwrite it if you have a site-specific figure.

Your electricity

Variable rate from your bill, without standing or capacity charges. The value shown is a placeholder, not a market rate.
From half-hourly meter data. 75% is the planning figure used elsewhere on this site.
Octopus Outgoing Fixed, checked 20 October 2026. Rates change; set 0 to ignore export.
The range published on the cost page. Use a quotation if you have one.
0 keeps today's prices throughout.
Shows the Workplace Charging Scheme amount. No charging income is modelled.

Your indicative numbers

How the model works

ItemWhat the calculator doesSource or basis
System sizeBays x kWp per bay1.5 kWp is this site's planning figure. A 580 W module (JA Solar JAM72D40-580) measures 2,278 x 1,134 mm, so 1.5 kWp is about 2.6 modules per bay; a full-coverage layout fits up to four. Module dimensions are from supplier listings of the datasheet; confirm them for the module you specify.
GenerationkWp x regional yield, then degradationPVGIS v5.3, SARAH3 2005 to 2023, 14% losses included, 10 degrees. London 920, Leicester 885, Manchester 807, Glasgow 772 kWh per kWp south-facing; east-west is lower. Output falls 1% in year 1 then 0.4% a year, the linear curve on the module family's warranty.
Value of the powerUsed on site at your price, the rest exported at your export rateYour bill and your tariff. Use on site cannot exceed your annual use, which is spend divided by price.
Tax reliefYear-one relief on the capital cost, then tax on the savingsAnnual Investment Allowance: 100% on up to £1m a year; a company can claim 50% first-year allowance above that; full expensing does not cover solar. See capital allowances on a solar carport.
Capital costkWp x your low and high £ per kWpThe range on the cost page. Not a quotation.
EVShows the Workplace Charging Scheme amount only£500 a socket, 40 sockets, to 31 March 2027. See the funding checker.

A worked example

200 bays at 1.5 kWp is 300 kWp. In the Midlands, south-facing, that is about 265,500 kWh in year one. With £125,000 of annual spend at 30p a kWh, 75% used on site, a 12p export rate and a company paying 25% tax, the capital cost is £285,000 to £390,000 and year-one tax relief is £71,250 to £97,500. The year-one saving is about £67,025 before tax. Payback after tax is 4.3 years to 5.9 years (the same as simple payback here, because the whole cost is inside the £1m allowance, so the relief and the tax on the savings cancel out), and the 25-year net benefit after tax is £903,295 to £982,045 in today's prices. Change the 30p and the answer moves a long way: the price you pay is the biggest single driver, which is why the form asks for your own and the 30p is only a placeholder.

What it leaves out

  • Operation and maintenance, insurance and inverter replacement.
  • Finance interest, discounting and inflation.
  • The cost of EV chargers and any income from them.
  • Grid connection costs and export limits, which can cap the array whatever its size. See the G99 guide.
  • Half-hourly load matching, which decides the real self-consumption share.

Before you size anything, check the car park suits solar at all with the screening guide on which car parks suit solar, and read how much a bay generates and how many panels fit over a bay for the arithmetic behind the inputs. Funding is on the funding checker and the tax detail on capital allowances and business rates.

Send these numbers with your enquiry

Your inputs and the result go with the form, so what you saw is what we read. We reply by email. Solar Car Parks is an independent information site published by SEO-DONS LTD. We are not an installer. We use your details to answer your enquiry; see the privacy notice.

We reply by email.
Common questions

Calculator FAQs

What does the calculator assume about my electricity price?
Only what you type in. Enter the variable price per kWh from your latest bill, excluding standing and capacity charges, which solar does not avoid. The starting figure in the box is a placeholder, not a market rate. The export rate is also yours to set; the starting figure is the Octopus Outgoing Fixed rate we checked on 20 October 2026 and export rates change.
Why might the result differ from another calculator?
Three reasons. It counts tax on the savings, because a lower energy bill raises taxable profit. It applies the module warranty's degradation curve instead of flat output. And it models no EV charging income, because the old assumption for that was unsourced. Each can be changed or ignored if you want a more generous figure, but a model should say what it leaves out.
Where do the yield figures come from?
PVGIS version 5.3 (SARAH3 satellite data, 2005 to 2023), modelled for a free-standing array at 10 degrees with 14% system losses already included. Those losses are why the calculator does not apply a further performance ratio. Cities not listed are in the generation per bay guide.
Does it include maintenance, insurance and finance?
No. It leaves out operation and maintenance, insurance, inverter replacement, finance interest and discounting, so the 25-year figure is a ceiling for a debt-free purchase, not a forecast. Add your own allowances for those before comparing it with a quotation.
Is the result a quote?
No. Solar Car Parks is an independent information site published by SEO-DONS LTD. We do not install, survey or quote. A firm price needs a written quotation from a supplier for your actual site.