How Many Solar Panels Fit Over One Parking Bay?

Bay count, not floor area, is what sizes a car park array — and the answer sets the kWp, the generation and the grid application. Here is the arithmetic, and where it goes wrong.

Why bay count beats floor area

A canopy frame lands between bays, not across them, so the usable array follows the parking layout rather than the painted area of the car park. The working figure for a commercial canopy is about 1.5 kWp per standard bay, which at current module ratings is roughly three to four panels. Floor-area estimates routinely overstate the array because they ignore the columns, the circulation aisles and the setbacks the structure needs.

What that generates, by where you are

Canopies sit at a shallow pitch, around 10 degrees, because a steeper tilt costs headroom and adds wind load — so the rooftop 35-degree yield figure does not apply. At 10 degrees facing south, PVGIS gives roughly 920 kWh/kWp in London, 946 in Cardiff, 807 in Manchester and 772 in Glasgow. A 200-bay car park at 1.5 kWp per bay is about 300 kWp, generating roughly 276,000 kWh a year in London and about 232,000 in Glasgow.

The number that actually decides the business case

Self-consumed generation is worth the full retail electricity rate; exported generation earns the Smart Export Guarantee rate, which is lower. So the question is not how many panels fit, it is how many the site can use during daylight. A car park attached to a building with a weekday daytime load — a supermarket, a hospital, an office estate — self-consumes most of what it generates. A car park that empties at 18:00 next to a building that does the same exports the surplus at a lower rate. Size against the load curve, not the roof area — and read solar carport cost for what the resulting array costs per kWp.

Where the arithmetic breaks

Three common errors: using a 35-degree rooftop yield for a 10-degree canopy, which overstates generation by a tenth or more; assuming the full bay count when the DNO imposes an export limit, which caps what the array can do regardless of its size; and quoting G98 for the connection, when G98 stops at 16 A per phase — about 3.68 kW per phase — so every car park array is a G99 application. Full detail on sizing and specification sits on the car park solar panels page.

Get an indicative figure for your own car park

Send the details below and we reply by email. The answers help us reply with something relevant to your site.

Solar Car Parks is an independent information site published by SEO-DONS LTD. We are not an installer. We use your details to answer your enquiry; see the privacy notice.

We reply by email. No obligation.

Discuss This For Your Site

Tell us about the car park. We reply by email.

Send an enquiry