Can You Add Solar Panels to an Existing Carport or Car Park Shelter?

Sometimes it can. What decides it: the roof covering and its fixings, the strength of the frame, the cable route and the approvals, ending with a checklist you can give a structural engineer.

Short answer

Sometimes. An existing carport or car park shelter can take solar panels where the roof covering can be fixed to, the frame has spare capacity for the added weight and wind uplift, and the cable route and grid connection work. A structural engineer has to check the specific structure; there is no general rule that a shelter is strong enough.

What decides whether an existing structure can take panels

The shelter was designed to keep rain off cars, not to carry an array in the wind. Ten things decide whether it can change role. An engineer can answer most from drawings and a visit; two or three can end the idea outright.

1. Roof covering and fixing type

The covering sets how modules attach. Profiled sheet is commonly clamped or through-fixed, depending on profile and condition. Standing seam can often take seam clamps without holes, but only clamps made for that profile. Glazed roofs (polycarbonate or glass) are generally not a place to fix PV, so the roof would be replaced. Fabric or membrane shelters are tensioned structures, not a surface to fix modules to. Ask the covering’s manufacturer what is acceptable.

2. Purlin spacing and condition

A typical module is about 2.3 × 1.1 m, and its rails must land on purlins or other members at spacings the module manufacturer allows. Purlins that are too far apart, too light or corroded cannot be relied on, and adding secondary members adds work and load.

3. Structural capacity

The engineer compares the original design loads with what the array adds: dead load from modules and rails (a module is commonly in the region of 25-35 kg, but the chosen module’s datasheet gives the real figure) and wind uplift on a larger, more exposed surface. As the weight guide explains, wind and ground usually govern, not the panels. Loads follow BS EN 1991 for the site, and connections and foundations are checked as well as members.

4. Age and corrosion

The structure has to stay sound as long as the panels do. Look at galvanising or paint, column bases, connections and impact damage. If the roof covering will need replacing before the panels reach the end of their life, the array has to come off and go back on.

5. Drainage

Gutters and downpipes were sized for the old roof. Modules change where water runs, so check the discharge point and any drainage conditions on the site.

6. Shading and orientation

An existing roof has a fixed pitch and direction, and trees, buildings or lighting columns may shade it. In the PVGIS runs on the tilt and orientation page, an east-west plane at 10 degrees yields roughly 8-9% less per year than a south-facing plane at the same tilt. Model the actual roof before assuming a figure.

7. Cable routes to the main board

DC cables run from the array to inverters and AC cables on to the main distribution board. The route, inverter location and isolation points must be planned, and trenching through tarmac needs a utilities survey. A long run from a remote shelter can decide the scheme.

8. Fire, inspection and access

Modules need safe access for inspection and cleaning, clear labelling and isolation points responders can find. A fragile roof needs access arrangements before anyone walks on it. Agree these with the site’s insurer and fire risk assessor.

9. Warranty on the existing roof

Fixing to a roof can affect its own warranty. Ask the roof supplier or installer in writing whether the proposed fixings are acceptable, before ordering anything.

10. Grid connection

The G98 route stops at 16 A per phase, about 3.68 kW per phase, so any car park array is a G99 application to the DNO. The response can carry a cost, a condition or a queue position, and it can end a scheme, so start early. The G99 application guide sets out the steps.

Planning: what applies when the structure already exists

For a new structure in England, Class OA of Part 14 of the General Permitted Development Order 2015 has applied since 21 December 2023. It covers installing, altering or replacing a solar canopy in an area lawfully used as off-street parking, other than parking for a dwellinghouse or block of flats. It is prior approval, not an exemption: the authority considers siting, design and external appearance, including glare. The canopy may not exceed 4 m above ground, may not be within 10 m of the curtilage of a dwelling, and approval is deemed after 56 days if the authority does not decide. It applies in England only; the solar carports guide sets out its limits.

Panels on a shelter that already exists are a different question, and this page does not claim Class OA settles it. What matters includes how the shelter was approved, any conditions on that permission, whether the panels change its appearance or height, and whether the site is listed or in a conservation area; see the conservation-area guide. Ask the local planning authority in writing before ordering.

Retrofit or replace with a purpose-built solar carport?

A retrofit is worth pursuing when the frame is sound, the covering can be fixed to, the pitch and orientation are reasonable and the shelter covers the bays you want to generate over. It stops making sense when strengthening cost and disruption approach the cost of starting again.

Signs that point to replacement: a frame that is old, light or corroded; a glazed, fabric or end-of-life roof; a poor orientation or pitch; columns in the wrong place for the bay layout; or a shelter over a walkway rather than parking. A purpose-built frame is designed for the array, with loads, clearance and column grid set together. As a planning figure, a single-deck solar carport is sized at about 1.5 kWp per bay, and an existing shelter covering fewer bays gives less. The solar carports guide covers the purpose-built route, the costs page shows how a scheme is built up, and the terms and structure types guide helps you describe the structure you would commission.

Survey checklist you can give a structural engineer

Ask for a written statement of whether the structure is adequate, what strengthening is needed and which loads it was checked against.

  • Drawings, calculations and original design loads, with the date built or last altered.
  • Structure type and material: column positions, member sizes, spans, purlin spacing and connection details.
  • Roof covering type, age, condition, fixing method and any warranty.
  • Photographs of connections, column bases and any corrosion, impact damage or leaks.
  • Foundation information, and any known buried services, drainage or tanks near the columns.
  • Site postcode, altitude and exposure, such as open ground, coast or hill.
  • Proposed module count and layout, with module size and weight from the datasheet.
  • Drainage layout, planning history, conditions and listed or conservation status.
  • Likely cable route, inverter position and distance to the main board.

For the wider specification see the car park solar panels guide, and for charging bays under a solar roof see EV charging canopies.

Common questions

Adding Panels to an Existing Carport: FAQs

Can you put solar panels on any carport?
No. It depends on the roof covering and its fixings, the strength and condition of the frame, the wind and snow loads at the site, and the cable and grid route. A structural engineer has to check the specific structure. Some shelters can take panels with modest work, some need strengthening and some are better replaced.
Do I need planning permission to add panels to an existing car park shelter?
It depends, so ask the local planning authority. In England, Class OA of Part 14 of the GPDO (in force since 21 December 2023) gives a prior-approval route for a solar canopy over off-street parking, with limits including a 4 m height ceiling and a 10 m distance from housing curtilage. Panels on an existing structure are a separate question that can turn on conditions on the original permission and on listed or conservation status. See the planning permission guide.
Do I need a structural survey?
Yes. A structural engineer should check the original design loads against the added weight and, more importantly, the wind uplift on a larger, more exposed roof, plus the connections and foundations. The weight guide explains why wind and ground usually govern, not the panels themselves.
Will adding solar panels void my existing roof warranty?
It can. Fixing to a roof covering may affect the manufacturer or installer warranty. Ask the roof supplier in writing whether the proposed fixings are acceptable and on what conditions, before anything is ordered.
Is retrofitting cheaper than a new solar carport?
Not automatically. A retrofit avoids a new frame but can add strengthening, re-roofing, access work and longer cable runs, and an existing shelter may cover fewer bays. Compare quotes on the same basis, including any strengthening and later roof replacement. The costs page shows how a new scheme is built up.

Tell us about the existing structure

Send the details below and we reply by email. The answers help us reply with something relevant to your site.

Solar Car Parks is an independent information site published by SEO-DONS LTD. We are not an installer. We use your details to answer your enquiry; see the privacy notice.

We reply by email. No obligation.

Ask About Your Existing Carport or Shelter

Tell us about the structure. We reply by email.

Send an enquiry