The UK Solar Carport Buyer's Guide 2026
What finance directors, sustainability leads and estate managers need to weigh up before commissioning a solar carport: costs, grants, planning, finance and ROI maths, plus a checklist of questions to put to an installer. Each topic links to its detailed page on this site, and there is no download.
What's inside
What to work out
The guide is written so finance teams can evaluate a solar carport without needing a sales call first. Each section below says what to work out and points to the detailed page on this site.
Section 1 — Cost & ROI economics
- Typical 2026 UK turnkey cost per kWp (£950-£1,300 band) and what drives it, on the cost page
- Worked budgets for 75/150/300/500/1,000/2,000 kWp
- Annual savings, simple payback, after-AIA payback and 25-year net benefit, using the ROI calculator
- Which assumptions move payback most: self-consumption, tariff, yield and capex
Section 2 — Grants & funding routes
- PSDS Phase 4: closed to new applications in November 2024, and what that means for public bodies
- Salix-administered public-sector programmes, which differ by nation
- OZEV Workplace Charging Scheme: £500 per socket, up to 40 sockets (£20,000 per applicant)
- AIA and the Salix public-sector loans in Wales and Scotland (terms change, so check the current position)
- How routes can be combined, on the grants and funding page
Section 3 — Finance products compared
- Direct capital (AIA tax benefit)
- Asset finance (typically 5-7 yr terms; rate from a written lender quote)
- PPA (typically 15-25 yr, 14-18p/kWh fixed)
- How year-one cashflow differs by route, on the finance page
Section 4 — Planning, DNO and delivery
- Class OA prior approval and NPPF policy W3 — the planning route for a car-park canopy, set out on the solar carports page
- Pre-application advice for sensitive sites, including conservation areas
- G99 grid connection process and typical timeline
- Construction sequence and phased delivery on live sites, after checking the car park suits solar and can take the weight
Section 5 — Questions to ask an installer
- Which registrations do you hold (NICEIC or NAPIT for the electrical work) and, if the array is under 50 kW, a current MCS certificate?
- Is the quotation itemised, with structure, PV, electrical, grid connection and planning costs shown separately?
- Does the price assume any DNO upstream reinforcement, or is that excluded?
- Which planning route applies (Class OA prior approval or a full application), and who handles it?
- What warranties apply to panels, inverters, structure and workmanship, and is an insurance-backed extension available?
- Are EV charge points included or priced separately, and is the design ready for more later?
- What is the phasing plan for building over a live car park?
- What does the O&M contract cover, and at what price per kWp per year?
What happens after I send the form? We reply by email. Solar Car Parks is an independent information site and not an installer.
Prefer a Sector-Specific Buyer's Guide?
Each of these covers one sector: focused figures, sector-specific compliance and the funding routes that apply.
Retail & Supermarket
Customer EV charging, supermarket sustainability evidence, live-trading delivery.
Healthcare / NHS
PSDS closure and the routes that remain, HTM compliance, Greener NHS evidence.
Education
Salix programmes by nation, DfE CIF, curriculum integration, term-time delivery.
Public Sector / Council
The PSDS closure and what it means for a capital paper, framework procurement, public EV concession revenue.
Logistics
LCV fleet electrification, depot DC rapids, FORS Gold + SECR.
Hospitality
Guest EV charging revenue, PMS billing, B Corp recertification evidence.
Manufacturing
Rooftop + carport stacking, BMS integration, CCA + ESOS evidence.
Who the Guide Is For
Written for procurement, finance and sustainability teams at NHS trusts, universities, councils, retailers and logistics operators weighing a solar carport.