Independent guide to commercial solar carports · Not an installer · Send an enquiry
Sector checklist

Logistics & Distribution Centres Solar Carport Buyer's Guide and Checklist

A buyer's checklist for distribution centre and 3PL car parks: LCV fleet electrification, depot DC rapid integration and FORS Gold credit.

On-page checklist Tailored to your sector Read online, no download

Key Logistics & Distribution Centres numbers

£620k
Modelled annual saving at 1.6 MWp
64
× 50 kW DC rapids for the LCV fleet in the model
£1.35m
AIA-deducted capital in the modelled funding mix
3.4 yr
Modelled payback after AIA

The Logistics & Distribution Centres Solar Carport Checklist

This checklist is for logistics & distribution centres buyers — typically finance directors, sustainability heads, estate managers or procurement leads — and sets out what to check, ask and budget for before a carport project goes to tender.

What to check

  • Fleet electrification: pair depot solar with LCV DC rapids and size the AC infrastructure from the start
  • AIA and OZEV WCS: check how they stack at logistics scale
  • G100 export-limited DNO connections and battery storage: ask the network operator what export is available
  • FORS Gold and SECR Scope 2 reporting: check what evidence the project must produce
  • TMS integration for fleet charge scheduling
  • ESOS Phase 4: check the evidence requirements
  • Worked example: see the modelled 1.6 MWp parcel operator carport on the logistics sector page

How to use the checklist

  • Run an internal feasibility estimate for your site profile
  • Identify the right funding route (capital allowances / PPA / asset finance / nation-specific public-sector programmes)
  • Build the business case for board/committee approval
  • Know what to ask installers when running a competitive tender

Before you appoint an installer

  • Check the installer's MCS certificate on the MCS register where the scheme applies, and OZEV authorisation if EV chargers are included
  • Ask who holds the principal designer and principal contractor roles under CDM 2015
  • Ask for a RIDDOR record and a current CHAS, SafeContractor or Constructionline certificate
  • Ask who submits the planning and G99 grid applications, and what the quote includes
  • Ask what the O&M agreement and the manufacturer warranties cover

Related on solarcarparks.co.uk

Ask a question about your car park

We reply by email. Solar Car Parks is an independent information site published by SEO-DONS LTD; we are not an installer. See the privacy notice.

What happens next: We reply by email to your question about the car park. There is no PDF to download; the checklist on this page is the guide.

Ask a Question About Your Car Park

Tell us about the car park. We reply by email.

Send an enquiry