Solar Carport ROI and Payback in the UK: Real Numbers
What's the actual ROI on a commercial solar carport in 2026 UK conditions? Here are the typical numbers.
Simple payback: 4-7 years
Across our 32 delivered UK commercial solar carport projects, simple payback ranges from 4.0 years (best — supermarket retail with high daytime load) to 7.2 years (worst — heritage-sensitive hotel with reduced array). Average: 5.4 years.
After-AIA payback: 3-5 years
AIA reduces the effective capex by 25% (corporation tax saved on capex written off). Average after-AIA payback across our portfolio: 4.1 years. Best: 3.0 years (large logistics depot with 100% self-consumption).
Internal Rate of Return (IRR): 14-22%
Pre-tax IRR across our portfolio: 14% (low) to 22% (high). Average: 18%. After-tax IRR (including AIA): 20-28%. Vs corporate cost of capital of 8-12%, every project we deliver shows significant value creation.
Net Present Value over 25 years: 4-8× capex
Discounted cashflow at 8% discount rate over 25-year asset life — typical NPV is 4-8× initial capex. A £400k carport with £170k/yr saving and 2% RPI escalator generates 25-year NPV of ~£2.4m at 8% discount.
Sensitivity: what changes payback most?
Most-sensitive variables ranked: (1) Self-consumption rate — every 5% increase reduces payback by ~0.4 years; (2) Electricity unit rate — every 5p/kWh increase reduces payback by ~0.6 years; (3) Capex per kWp — every £100/kWp reduces payback by ~0.3 years; (4) Annual yield — every 50 kWh/kWp/yr increase reduces payback by ~0.4 years; (5) AIA availability — adds ~25% capex savings in year one.
Worked example: 300 kWp university carport
Capex: £290k. AIA tax saving: N/A (HE non-profit). Modelled on capital repaid from the energy saving over seven years (PSDS closed to new applications in November 2024 and Salix programmes are nation-specific); monthly repayments £3,450 × 84 = £290k. Annual saving (88% self-consumption × 47p/kWh × 224,000 self-consumed kWh + 31,000 exported × 15p SEG): £109k. Year 1 net cashflow: +£68k (£109k saving minus £41k repayments). Year 8+: +£109k/yr clean cashflow for ~17 remaining years. 25-year total benefit: ~£2.0m.
Read Next
Solar Canopy Architectural Design: UK Examples and Approaches
Solar canopies are increasingly designed as architectural features, not just utility structures. Here's how leading UK a…
6 min readSolar Carport Foundation Design: UK Ground Conditions
Foundations are the single biggest source of construction-cost variance on UK solar carport projects. Here's how foundat…
7 min readSolar Carport vs Solar Farm: Per-kWp Economics Compared
Solar farms and solar carports use the same panels but radically different economics. Here's the per-kWp comparison from…
8 min readDNO G99 Application Guide for UK Solar Carports
Every UK commercial solar carport above ~3.6 kW needs a G99 grid connection application to the local DNO. Here's the pro…
Related reading: how the AIA applies to a carport · bifacial car park panels · school and university car parks.
Get an indicative figure for your own car park
What you get: a free desk feasibility, returned within 5 working days — indicative system size in kWp, a turnkey capex band, estimated annual generation and saving, simple and after-AIA payback, and the grant routes your site qualifies for.
What we will not do: we do not sell your details to an installer panel, we do not add you to a marketing list, and we do not cold-call.
Discuss This For Your Site
Free feasibility study, indicative ROI within 5 working days.